Lancer: the B-1 at War:

Long and short stories from the 1984 movie
Post Reply
Matt Wiser
Posts: 875
Joined: Fri Nov 18, 2022 2:48 am
Location: Auberry, CA

Lancer: the B-1 at War:

Post by Matt Wiser »

The B-1's war service:


The B-1 Lancer in World War III


The Rockwell International B-1 had a troubled gestation, with the B-1A program having been canceled by the Carter Administration in 1977, with a revived B-1B program started by President Reagan in 1981. Initial aircraft were delivered to the USAF in 1984, though the 96th Bomb Wing at Dyess AFB had not yet begun transitioning to the new aircraft prior to the outbreak of war. The Wing suffered several B-52 losses to Cuban SOF on Invasion Day, and the decision was made to have the wing reform at Edwards AFB in California to begin the transition to the new aircraft as soon as possible. Deliveries began in 1986, and B-1B production continued after the war, with the B-1C version appearing in the late 1990s.

This work will cover all three B-1 variants.


B-1A: Initial version proposed for SAC in the 1980s. Four prototypes built, one crashed, one dismantled for radar testing. B-1A program canceled by President Carter 1977, but flight testing continued into the 1980s. Both prototypes used during the war for testing of B-1B systems. Prototype number two on display Edwards AFB. Prototype number four on display USAF Museum Wright-Patterson AFB, Ohio.

B-1B. Modified A model produced beginning 1982, with emphasis on low-level performance. Speed reduced from Mach 2.2 to Mach 1.25 at high altitude, but low-level speed increased to Mach .92. RCS reduced considerably from A model, and improved ECM. 100 aircraft initially ordered, wartime production increased B-1 orders to 275. Service in Operation EASTERN EXPRESS and in sorties over European Russia. Primary nuclear penetrator during the war and in the 1990s pending arrival of B-2. All Bs upgraded to C version.

B-1C: Final version produced for SAC. Reduced RCS signature from B, ECM suite upgraded, full conventional munitions capability added, including Sniper laser designation pods. Main SAC conventional penetrator, with full SIOP capability. Limited production run of new aircraft to fill attrition, most produced through CILOP (Conversion in Lieu of Production) of Bs. Aircraft expected in service through the 2030s.

B-1K: Version of B produced for RAF. Direct replacement for Vulcan force: five squadrons and an OCU served during the war, and last two Vulcan squadrons transitioned postwar. Primary RAF strategic bomber since the 1980s. Conventional strikes into European Russia during the war, and service in several postwar conflicts. RAF designation Lancer B. Mk. I. RAF conversion of existing airframes to C standard completed in 2009, designation Lancer B. Mk II.
The difference between diplomacy and war is this: Diplomacy is the art of telling someone to go to hell so elegantly that they pack for the trip.
War is bringing hell down on that someone.
Wolfman
Posts: 925
Joined: Fri Nov 18, 2022 4:03 pm
Location: LCS-3, BB-35, CGN-39, SSN-775

Re: Lancer: the B-1 at War:

Post by Wolfman »

The Bone… another bird Ivan came to loathe…
“For a brick, he flew pretty good!” Sgt. Major A.J. Johnson, Halo 2

To err is human; to forgive is not SAC policy.

“This is Raven 2-5. This is my sandbox. You will not drop, acknowledge.” David Flanagan, former Raven FAC
James1978
Posts: 1338
Joined: Thu Nov 17, 2022 8:38 pm

Re: Lancer: the B-1 at War:

Post by James1978 »

Matt Wiser wrote: Tue Dec 13, 2022 2:36 amInitial aircraft were delivered to the USAF in 1984, though the 96th Bomb Wing at Dyess AFB had not yet begun transitioning to the new aircraft prior to the outbreak of war. The Wing suffered several B-52 losses to Cuban SOF on Invasion Day, . .
OOC: I believe the first B-1B was delivered to Dyess on 29 June 1985, presumably for the 4018th CCTS.

And if I'm reading an appendix correctly, the last B-52 left Dyess 22 January 1985.
TheMann
Posts: 26
Joined: Sun Jan 28, 2024 4:52 am

Re: Lancer: the B-1 at War:

Post by TheMann »

Wolfman wrote: Tue Dec 13, 2022 2:41 am The Bone… another bird Ivan came to loathe…
Usually right before its ordinance blew him to hell and back....
Poohbah
Posts: 2691
Joined: Thu Nov 17, 2022 2:08 pm
Location: San Diego, CA

Re: Lancer: the B-1 at War:

Post by Poohbah »

RAF conversion of existing airframes to C standard completed in 2009, designation Lancer B. Mk II.
However, in the finest traditions of the MoD, some were "fitted for but not with" the full Mk II suite.
Bernard Woolley
Posts: 808
Joined: Thu Nov 17, 2022 4:06 pm
Location: Earth

Re: Lancer: the B-1 at War:

Post by Bernard Woolley »

Errr, no. Where did you hear that? All the Crab’s Lancers were upgrades to B.2 standard (we haven’t used Roman numerals for decades, btw),
Poohbah
Posts: 2691
Joined: Thu Nov 17, 2022 2:08 pm
Location: San Diego, CA

Re: Lancer: the B-1 at War:

Post by Poohbah »

Bernard Woolley wrote: Sat Feb 03, 2024 1:23 am Errr, no. Where did you hear that? All the Crab’s Lancers were upgrades to B.2 standard (we haven’t used Roman numerals for decades, btw),
Heard it from a retired Air Commodore who was doing the acquisition at MoD when the B.2 was getting budgeted. He told me that Big MoD somehow managed to forget to include the attrition allowance aircraft when presenting their estimates. So, for a few years, they had some gear that had to be moved between aircraft when they went in for phase inspections. It got resolved when the Phase II Product Improvement Program was funded, and everything's been fine since.
Post Reply