Another side-quest resolved-- Mostly...

Slide along a cold one, kick back and relax. Share amusing stories, anything on your mind, unwind amongst friends.
Post Reply
Nik_SpeakerToCats
Posts: 2410
Joined: Sat Dec 10, 2022 10:56 am

Another side-quest resolved-- Mostly...

Post by Nik_SpeakerToCats »

Having our big, old, corner-stood c/h combi boiler declared 'beyond economic repair' --In middle of winter, yet !!-- and, perforce, replaced by modern 'wall-hung' combi unit has totally deranged that end of my kitchen. Not only did I have to hastily remove a towering 'tallboy' cabinet to provide wall-space, the unfortunate boiler-guy diamond-drilled flue-hole through an unsuspected cable buried deep in the wall's old plaster.
Ouch.
Down-side, helluva mess.
Lost the tall-boy's extensive storage, mostly flatware. My 'working flatware' currently occupies the top deck of a three-tier work-shop trolley (!!) double-parked between table and fridge/freezer. Plaster left like a bombing range. New c/h boiler required 'significant' rerouting of pipes, and partly blocks the lower half of former pipes' 'boxing-in'. There's also a 'Chonky Thing' newly attached at waist-height to one of the c/h pipes like a big remora. It's a filter, 'Full Service Access' required...

Up-side, electricians' repair to that essential cable provided a new, high-level dual outlet. Handy for a night-light, handy for a future feed to out-side socket. Perhaps even for the kitchen WAP I keep promising myself...

I'm re-building the deranged plaster to N~~NE of boiler one skim of filler at a time, adding thin layers atop base-strata of plaster-board / sheet-rock jigsaw pieces. See pic. When area levelled and smoothed, I can route that spliced cable through neat clip-lid conduit from beside the new socket to a notch in the boxing. Its batten then dog-legs around shoulder of boiler, comes down past the 'Chonky Thing'.

Latter needs a split cover for 'toolless access''.
Contriving such took several pairs of N/S 12mm CSK ring magnets, their central holes having 4mm clearance. The 'S' wood-screw into their counter-bored battens. The 'N' bolt through their hard-board halves with CSK machine screws to neat bow-handles, which usually take M4 pan-heads. There'll be a 'doubler' plate' glued to RHS half, with magnetic tape to cling to left...

When that's resolved, I must drill a low-level 42mm hole for the new P-trap and drain for side-shifted laundry machine. I've already updated the cold-feed location, taken out weeping stop-end from original boiler in passing. I also replaced the long-seized Winter shut-off for outside tap discovered behind 'un-documented port-hole' in back of tall-boy...

With those done, I can get and assemble a flat-pack 1000mm 'blind corner' kitchen unit, tuck RHS into old boiler's gap in place of my temporary table. Unit will have a 180º shelf carousel, swallow my 'working' flatware. Yay !!

I wanted a 'drawer-line' base, but they have fallen out of fashion. So, 'slab-line' or thrice the price...
Happens the laundry machine stands taller than the rest of kitchen's units. Before, it had its own spanning work-top, raised a palm-width above the old boiler, reaching across to side of that now-lost tall-boy...

Well, if I must again have a riser, its foot-print could match the new 'blind corner' unit. And, with a couple more inches height, accommodate a pre-made drawer box. That would swallow many of the 'occasional' but then essential utensils that had been in a busy carousel in the tall-boy. Too many are currently 'dependent' from S-hooks above cooker...

Another victim of losing the tall-boy was storage for plate spacers and covers that hopped between that and the two microwaves, especially my favourite, the neat one beside kettle and sink. They've been precariously balanced atop the sink's busy draining board, but I wanted better.

Could I give that microwave its own mini-riser, with some storage space beneath ?
Well, yes. Took some lateral thinking, a sheet of grease-proof paper to trace the rubber feet's footprint, and four 'oval' wardrobe rails' end-fittings to grab them just so. See other pic. Those corner legs are rated for a cabinet, couch or futon, so laughably stronger than required. Finishing strip for front is due next week...

So, yes, our Poltercats can no longer tip those drainer-poised spacers into sink, or send them cart-wheeling across room at Oh-Fook-Dark-Thirty...
;) ;) ;) ;)
IMGP0518_10.jpg
IMGP0516_10.jpg
You do not have the required permissions to view the files attached to this post.
If you cannot see the wood for the trees, deploy LIDAR.
warshipadmin
Posts: 973
Joined: Mon Nov 28, 2022 4:16 am

Re: Another side-quest resolved-- Mostly...

Post by warshipadmin »

Not quite relevant, when we had the new house built I specified the hole for the microwave should fit our big microwave. We move in. Microwave doesn't fit. Moan to builder, he gets the joiner to come in, move shelves up, shorten cupboard doors, etc. All a bit of hassle. Two weeks later the microwave blows up and we buy one that would have fitted in the original hole.

Just thinking about it... the builder could have bought us a new microwave to fit the original hole. It would have been cheaper!
Last edited by warshipadmin on Tue Mar 26, 2024 2:05 am, edited 1 time in total.
User avatar
jemhouston
Posts: 6544
Joined: Fri Nov 18, 2022 12:38 am

Re: Another side-quest resolved-- Mostly...

Post by jemhouston »

This way, it's easier to take the microwave out for cleaning. :D
warshipadmin
Posts: 973
Joined: Mon Nov 28, 2022 4:16 am

Re: Another side-quest resolved-- Mostly...

Post by warshipadmin »

Cleaning the microwave? Nah, it has a patina that accumulates until I do something spectacularly stupid.
Nik_SpeakerToCats
Posts: 2410
Joined: Sat Dec 10, 2022 10:56 am

Re: Another side-quest resolved-- Mostly...

Post by Nik_SpeakerToCats »

That appliance P-drain and its wall-hole ?
Seems the old one used slim, solvent-bonded joints, so trap and outlet elbow could stand real-close to wall.

Vibration could dislodge push-fittings, hand-compression type are even bulkier...
Job needs several 'stand-off' Munsen-rings, rubber lined of course: So ordered !!!
If you cannot see the wood for the trees, deploy LIDAR.
Nik_SpeakerToCats
Posts: 2410
Joined: Sat Dec 10, 2022 10:56 am

Re: Another side-quest resolved-- Mostly...

Post by Nik_SpeakerToCats »

The glue set, the filler set, the conduit behaved, the box-batten's lonnnng screw grabbed the deep-set wall-plug and held. I've also upgraded the board fastenings from skinny x 3/4 to 4mm x full inch, plus plastic clip-caps.
Looks a bit more civilised...
IMGP0519_10.jpg
You do not have the required permissions to view the files attached to this post.
If you cannot see the wood for the trees, deploy LIDAR.
Nik_SpeakerToCats
Posts: 2410
Joined: Sat Dec 10, 2022 10:56 am

Yet Another side-quest resolved-- Mostly...

Post by Nik_SpeakerToCats »

Have now re-boxed that gas pipe behind microwave at lower right, again with up-sized screws plus clip-caps.
Cover runs to foot of batten beside window, looks so much better...
Cold-feed to sink and dish-washer is lower down, accessible for lagging when swap temporary table for planned 'Blind Corner' cabinet.

Made cardboard templates to box around C/H 'Chonky Thing', drew out hardboard pattern, estimated holding-magnet & handle positions.
Down-side, still waiting on those M4 x 12mm CSK machine screws.
( Delayed by Easter Break-- In March !! )
Oops, my old fret-saw has vanished: New one ordered, plus baggy of spare blades...
If you cannot see the wood for the trees, deploy LIDAR.
Nik_SpeakerToCats
Posts: 2410
Joined: Sat Dec 10, 2022 10:56 am

Hold it right there...

Post by Nik_SpeakerToCats »

Gotcha !!!
:D :D :D
Yes, seam has a spaced 'doubler' plate, with A/B magnetic tape to give snug fit.

'Metallic' self-adhesive covers for those unsightly, but sadly essential alignment screw-holes are due next week...
IMGP0522_combin.jpg
You do not have the required permissions to view the files attached to this post.
If you cannot see the wood for the trees, deploy LIDAR.
Nik_SpeakerToCats
Posts: 2410
Joined: Sat Dec 10, 2022 10:56 am

Re: Another side-quest resolved-- Mostly...

Post by Nik_SpeakerToCats »

Belatedly realised that if I build-out / stand-off that newly re-instated legacy pipe-boxing visible at lower right by just an inch, this allows its front panel alignment to extend 'un-interrupted' all the way to left, while neatly hiding most of the lower c/h boiler connections.

Saves having to intricately profile and notch the back edge of new work-top: Its pre-cut two-metre 'spanning' section would just lift into place as-is, parallel-park. For which task, I've a folding engine-hoist, AKA 'The Iron Mantid'. Yes, yes, I'd have to add leg(s) etc at left end, beyond the 'spanned' laundry machine, and a couple of substantial wall-ties but, hey, they're almost trivial...

Okay, means silk-smooth sanding upper face of add-on batten sections, applying ironed-on 30mm laminate edging and trimming to size, then replacing current boxing's M5x25 mm screws with eg M5x50 or x55 mm. I salvaged sufficient 'treated' batten lengths from among roof-work off-cuts, and the other makings are 'in the post'...
:D :D :D
If you cannot see the wood for the trees, deploy LIDAR.
Post Reply